This project will consist of widening the existing roadway to three lanes between Shop Road (SC 768) and Garners Ferry Road (US 76/US 378). The addition of a two‐way left turn lane along the length of the roadway with exclusive left turn lanes at certain locations.
Project Status:
The contract has been awarded to Palmetto Corp. KCI Technologies has been awarded the CE&I contract.