Sunset Drive Sidewalk
District 4
Project consists of a 5 ft. wide sidewalk along the north side of Sunset Drive from River Drive to Elmhurst Road.

Project Status:
- This project is 99% complete. a ribbon cutting ceremony was held on November 12, 2025. Guardrails are to be added, and the project is anticipated to be 100% complete by January 2026.
Planned Route: