Sunset Drive Sidewalk

District 4

Project consists of a 5 ft. wide sidewalk along the north side of Sunset Drive from River Drive to Elmhurst Road.

 

Project Status:

  • The Sunset Drive project is now complete, with a ribbon-cutting ceremony held on November 12, 2025, to commemorate substantial completion. Final construction activities included roadway leveling to ensure proper surface elevation and drainage, followed by placement of the final asphalt driving surface, which concluded all construction operations. A final inspection was conducted on May 12, and a punch list was subsequently issued and has now been fully addressed. The remaining project activity is to secure final acceptance from SCDOT.