Percival Road Sidewalk
Districts 6,8,10
Project consists of a 5 ft. wide concrete sidewalk on one side along Percival Road from Forest Drive to Decker Boulevard.

Project Status:
- The project has been awarded, clearing and grubbing is complete and erosion control measures have been installed. The contractor is continuing to pour sidewalk; the mucking operation is complete, and 90% of the guardrail has been installed. Next week the contractor will be working on change order items.
Planned Route:
