Pineview Road Widening
Districts 10,11
This project will consist of widening the existing roadway to three lanes between Shop Road (SC 768) and Garners Ferry Road (US 76/US 378). The addition of a two‐way left turn lane along the length of the roadway with exclusive left turn lanes at certain locations.

Project Status:
- Awaiting SCDOT reply to final plans submitted on 6/5/25. ROW update 44 of 49 (90%) tracts have been secured. Awaiting condemnation filing by the attorney. ROW process is ongoing.
Planned Route:
