Projects

The Project list contains upcoming, in construction and completed projects paid for by the Penny Tax.
Find and track a project close to you.

Columbia Mall Greenway

Project Details:

The proposed project is a greenway which bypasses the congested areas around Columbia Mall, beginning at Trenholm Road North of O’Neil Ct. to Trenholm Road South of Dent Middle School.

Pre-Design
Design / Right of Way
Construction
Completed

Commerce Drive Improvements

Project Details:

The project for re-alignment of the roads awaits runway expansion approvel by FAA.

Pre-Design
Design / Right of Way
Construction
Completed

Crane Creek Greenway

Project Details:

Project scope is to design a recreational greenway from the canal headgates extending north along the west side of the Broad River across Smith Branch, then turn toward the edge of Broad River and continue north along the rivers edge crossing over Crane Creek and terminating before I-20. Design a bridge across Smith Branch to carry City of Columbia specified vehicles and pedestrian crossing over Crane Creek.

Pre-Design
Design / Right of Way
Construction
Completed

Crane Creek NIP

Project Details:

The scope of this project was determined in Phase 1 (concept phase) and was selected directly from the approved Richland County Neighborhood Master Plan and refined based public and stakeholder input and available funding. The project will be further broken down into two phases. Phase 2 will include (1) new sidewalk and streetscape improvements along Blue Ridge Terrace, Heyward Brockington Road, and Crane Church Road; and (2) streetscape improvements along Monticello Road. Phase 3 will include new sidewalks along Dakota Drive, Seagull Lane, Roberson Street, and Lincolnshire North Drive.

Pre-Design
Design / Right of Way
Construction
Completed

Decker/Woodfield NIP

Project Details:

The scope of the proposed neighborhood improvement project was determined in Phase 1 (concept phase) of this project. The project scope was selected directly from the approved Richland County Neighborhood Master Plan and refined based on public and stakeholder input and available funding. The project will be further broken down into two phases. Phase 2 will include design and plan development for Brookfield Sidewalk, Faraway Sidewalk and the Chatsworth Pedestrian Connector. Phase 3 will include Decker Blvd Streetscape improvements including intersection improvements along Decker Blvd.

Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Package K

Project Details:

The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County. (Robert James Road, Rocky Road, Barkley Road 11, South Dr).

Project Length: 0.952 mic
District: 10, 11

Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Package L

Project Details:

The work includes the paving of Dogwood Shores Lane, Lake Dogwood Circle S, and Wider Rd. These roads include 9 foot wide lanes and total 3,598 ft in length. Other improvements include upgrades to stormwater drainage other safety measures.

Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Package M

Project Details:

Dirt Road Paving Package “M” covers the paving of four Richland County dirt roads.

  • Bow String Road
  • Maggie Hipp Road
  • Rosa Dowdy Road
  • Tall Oaks Drive
Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Package N

Project Details:

Dirt Road Paving Package “N” covers the paving of three Richland County dirt roads.

  • Cornell Adams Run
  • Summer Haven Drive
  • Vallenga Drive
Pre-Design
Design / Right of Way
Construction
Completed