The Project list contains upcoming, in construction and completed projects paid for by the Penny Tax.
Find and track a project close to you.

Polo Road Widening

Project Details:

The proposed scope is from Two Notch Road to Mallet Hill Road with bicycle and pedestrian accommodations. Based on Council’s approval, the scope provides intersection improvements (turning lanes) at the locations of the four intersections (Polo Road with Two Notch Road, Running Fox Road, Miles Road, and Mallet Hill Road), and then include 5’ concrete sidewalk with 3’ offset from back of curb and gutter section along both sides of the roadway.

Pre-Design
Design / Right of Way
Construction
Completed

Polo Road/Windsor Lake Greenway

Project Details:

The project consists of approximately 0.75 miles of a greenway and trail with bridges, boardwalks, and supporting facilities that extend from Windsor Lake Boulevard North of I-77 along the I-77 and I-20 interchange to the intersection of Alpine Road and Polo Road.

Pre-Design
Design / Right of Way
Construction
Completed

Resurfacing Package R

Project Details:

Milling, full depth patching, and/or resurfacing of approximately 18.22 miles of roadway located within Richland County.

Project Length: 18.22 mi
District: 1, 2, 7, 8, 9, 10, 11

Pre-Design
Design / Right of Way
Construction
Completed

Resurfacing Package S

Project Details:

Milling, full depth patching, and/or resurfacing of approximately 6.6 miles of roadway located within Richland County.

Project Length: 6.6 mi
District: 1, 2, 3, 4, 7, 8, 9, 11

Pre-Design
Design / Right of Way
Construction
Completed

Resurfacing Package T

Project Details:

Milling, full depth patching, and/or resurfacing of approximately 4.2 miles of roadway located within Richland County.

Project Length: 4.2 mi
District: 1, 3, 6, 8, 9, 11

Pre-Design
Design / Right of Way
Construction
Completed

Screaming Eagle/Percival Intersection

Project Details:

The proposed scope recommends realigning Screaming Eagle Road to bring the angle of the intersection closer to 90 degrees, which will improve safety as well as widening Screaming Eagle Road to provide left- and right-turn lanes to improve capacity. Percival Road will also be widened to provide a left-turn lane onto Screaming Eagle Road.

Pre-Design
Design / Right of Way
Construction
Completed

Shop Rd Extension Phase 2

Project Details:

The proposed descope includes proceeding with Alternate 4 from Shop Road Ext. Ph. 1 to Montgomery Ln. and then allow traffic to continue on Montgomery. Also, perform any needed intersection improvements along Montgomery\Old Hopkins, and improve safety at existing railroad crossing.

Pre-Design
Design / Right of Way
Construction
Completed

Shop Road Widening

Project Details:

The project consists of widening the existing roadway to five lanes (two lanes in each direction with a 15-foot center median) with 4’ bike lanes, curb and gutter, and sidewalks on both sides of the road from the intersection with George Rogers Blvd. toward Mauney Drive for an approximate distance of 2.2 miles. No improvements will be done to the roadway at the intersection with George Rogers Blvd.

Pre-Design
Design / Right of Way
Construction
Completed

Smith Rocky Branch Greenway

Project Details:

The scope of the proposed Greenway will be Granby Park to Gervais Street.

Pre-Design
Design / Right of Way
Construction
Completed