Active Projects

The Project list contains upcoming, in construction and completed projects paid for by the Penny Tax.
Find and track a project close to you.

Crane Creek NIP

Expected Completion: 07/01/2027

Project Details:

The scope of this project was determined in Phase 1 (concept phase) and was selected directly from the approved Richland County Neighborhood Master Plan and refined based public and stakeholder input and available funding. The project will be further broken down into two phases. Phase 2 will include (1) new sidewalk and streetscape improvements along Blue Ridge Terrace, Heyward Brockington Road, and Crane Church Road; and (2) streetscape improvements along Monticello Road. Phase 3 will include new sidewalks along Dakota Drive, Seagull Lane, Roberson Street, and Lincolnshire North Drive.

Pre-Design
Design / Right of Way
Construction
Completed

Decker/Woodfield NIP

Expected Completion: 04/01/2027

Project Details:

The scope of the proposed neighborhood improvement project was determined in Phase 1 (concept phase) of this project. The project scope was selected directly from the approved Richland County Neighborhood Master Plan and refined based on public and stakeholder input and available funding. The project will be further broken down into two phases. Phase 2 will include design and plan development for Brookfield Sidewalk, Faraway Sidewalk and the Chatsworth Pedestrian Connector. Phase 3 will include Decker Blvd Streetscape improvements including intersection improvements along Decker Blvd.

Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Paving Package “P”

Expected Completion: 03/01/2026

Project Details:

Dirt Road Paving Package “P” covers the paving of five dirt roads.

  • Larger St-District # 07 (1,853LF)
  • Spring Creek Rd- District # 10 (3,226 LF)
  • Smithcreek Rd- District #10 (1,256 LF)
  • Goodwin Way- District # 10 (1,531LF)
  • Adams Scott Rd- District #10 (3,484LF)

Pre-Design
Design / Right of Way
Construction
Completed

Dirt Road Paving Package “Q”

Expected Completion: 07/01/2026

Project Details:

Dirt road designs to be included in upcoming paving packages. Contracts include road construction plans; Stormwater drainage improvements; ROW certifications; Utility coordination; permitting; project manuals and other requirements for construction bidding packages.

  • Ravenbrook Rd – District # 10 (1,705LF)
  • Amick Ln – District #10 (332 LF)
  • Brown Rd- District #10 (929 LF)
Pre-Design
Design / Right of Way
Construction
Completed

Gills Creek Greenway

Expected Completion: 01/01/2028

Project Details:

The scope of this project was identified in Phase 1 (concept phase) of this project, and was based on public and stakeholder input, impact studies, and costs. Phase 2 scope includes approximately two thousand five hundred (2,500) linear feet of a greenway and trail with boardwalks and supporting facilities that extend along Gills Creek from S-2205 (Beecliff Drive) to S-407 (Mikell Lane).

Pre-Design
Design / Right of Way
Construction
Completed

Innovista 3 – Williams Street

Project Details:

The City will manage the project that continues Green Street from Huger Street to intersect with the continuation of Williams Street.

Pre-Design
Design / Right of Way
Construction
Completed

Jackson Creek Greenway

Expected Completion: 01/01/2028

Project Details:

This proposed project will consist of a greenway that extends from North Trenholm Road Extension and meandering along a route to be determined generally following Jackson Creek and terminating at Trenholm Road near Decker Boulevard. Total length of the greenway is proposed to be 1.3 miles.

Pre-Design
Design / Right of Way
Construction
Completed

Kelly Mill Rd Widening

Expected Completion: 12/01/2029

Project Details:

The proposed scope recommends widening the current roadway alignment from two lanes to three lanes (This new alignment starts at the intersection at with Hard scrabble road and extends 1.2 miles along Kelly Mill Road), along with adding sidewalk on both sides of the roadway for pedestrian access to Lake Carolina Elementary School & Kelly Mill Middle school.

Pre-Design
Design / Right of Way
Construction
Completed

Lower Richland Blvd Widening

Expected Completion: 10/01/2027

Project Details:

The project consists of widening the existing roadway to five lanes (two lanes in each direction with a 15- foot center median) from Garners Ferry Road (US 76 / 378) toward Rabbit Run (S-2089 / 404) for an approximate distance of 1300 feet. After 1300 feet, widen the existing road to three lanes (one lane in each direction with a 15-foot center median) to the intersection with Rabbit Run (S-2089 / 404). Extend the existing sidewalk along the east side of Lower Richland Boulevard to Garners Ferry Road. Provide a sidewalk on the west side of Lower Richland Boulevard from Rabbit Run to Garners Ferry Road. A roundabout will be constructed at the intersection of Lower Richland Boulevard and Rabbit Run. Improve the skew angle for the northbound approach on Lower Richland Blvd at Garners Ferry Rd.

Pre-Design
Design / Right of Way
Construction
Completed