Shop Rd Extension Phase 2
Expected Completion: 01/01/2028
The proposed descope includes proceeding with Alternate 4 from Shop Road Ext. Ph. 1 to Montgomery Ln. and then allow traffic to continue on Montgomery. Also, perform any needed intersection improvements along Montgomery\Old Hopkins, and improve safety at existing railroad crossing.




Shop Road Widening
Expected Completion: 06/01/2026
The project consists of widening the existing roadway to five lanes (two lanes in each direction with a 15-foot center median) with 4’ bike lanes, curb and gutter, and sidewalks on both sides of the road from the intersection with George Rogers Blvd. toward Mauney Drive for an approximate distance of 2.2 miles. No improvements will be done to the roadway at the intersection with George Rogers Blvd.




Smith Rocky Branch Greenway
Expected Completion: 08/01/2026
The scope of the proposed Greenway will be Granby Park to Gervais Street.




Southeast Richland Neighborhood Project (SERN) Phase 2
Expected Completion: 01/01/2025
The Southeast Richland Neighborhood Master Plan includes three projects that are included in the Transportation Penny Program. The three projects are: (1 Multi-use path on Rabbit Run from Garners Park Road to Lower Richland Blvd; (2 Multi-use path on Lower Richland Blvd from Rabbit Run to the High School; (3 Garners Park Road: 2-lane road on new location from US 76/378 (Garners Ferry Road/Garners Ferry Sports Complex to S-2089 (Rabbit Run, approximately 0.5 miles. A fourth project was included to correct an existing drainage problem with Rabbit Run.




Spears Creek Church Rd Widening
Expected Completion: 01/01/2029
The proposed descope is to widen the road to a 3-lane in order to provide a median from Two Notch Road to Jacobs Mill Pond Road.




Sunset Drive Sidewalk
Expected Completion: 12/12/2024
Project consists of a 5 ft. wide sidewalk along the north side of Sunset Drive from River Drive to Elmhurst Road.




Three Rivers Phase 2 Greenway
This project continues the greenway north under I-126 and crosses the Broad River.




Trenholm/New Castle NIP
Expected Completion: 01/01/2028
The scope of the proposed neighborhood improvement project(s) will be determined in Phase 1 (concept phase) of this project. Project(s) and scope options will be selected directly from the approved Richland County Neighborhood Master Plan and refined based upon public and stakeholder input and available funding.